Skip to main content

Schedule

Module not working in this version

The Agenda screen can be reached from the menu, but it is not connected to your workspace's data. The calendar it displays contains examples shipped with the calendar library — appointments named "A 3 day event", "Yes", "Noooo", "Yellow", some of them dated March 2023.

No manufacturing order, no appointment and no real data appear in it. Nothing shown concerns your company, and nothing you did in it would be saved.

This page describes the current state of the module; it will be completed when the module goes live.

Intended purpose​

The Schedule is meant to become the production planning screen: seeing manufacturing orders laid out over time, spotting workload overlaps and placing launches on a calendar.

As things stand, that function is not available.

Access​

  • Menu: Production management → Schedule
  • Address: /agenda
  • Screen title: Agenda, followed by the date displayed

What the screen shows today​

The screen presents a day view of a calendar, with time slots and coloured events. You can also see:

  • a pink area at the top left containing the word hello — a leftover of development layout;
  • the calendar displayed twice, once in the grid and once below it;
  • demonstration events unrelated to your business.

Clicking an event produces no visible effect.

Do not use this screen to plan

No entry is possible in it, no data is saved, and the items displayed reflect nothing real. Any planning done here would be lost.

How to plan in the meantime​

With no working schedule, planning relies on the fields already available in the manufacturing orders.

NeedWhere to handle it today
Set a production deadlineThe Date de livraison field of a launch.
Track progressThe État field of a launch: En attente, En préparation, Lancé, Bloqué, Suspendu, Terminé.
Report a postponement or a blockageMove the order to Suspendu or Bloqué, and set out the reason in Observation.
See upcoming ordersThe Production launches / MOs list and its Date livraison column.
Sorting priorities outside the application

Since the launch list offers neither sorting by date nor filtering by state, taking the data out by hand — a shared spreadsheet, a wall planner — is often still needed to schedule the week.

Not to be confused with customer appointments​

Customer appointments belong to another module, and that one does work: they are viewed from a customer's record, in Customer → Appointments. The production Schedule has no connection with them.

Messages and troubleshooting​

SituationWhat to do
Unknown appointments appearNormal behaviour: they are the calendar library's examples.
My manufacturing orders do not appearThe screen is not connected to the data; see Production launches / MOs.
I cannot enter anythingNo entry is provided for in this version.
The word hello appears at the top of the screenA leftover of development layout, with no consequence.
Clicking an event does nothingNormal behaviour in this version.

Known limitations in this version​

  • The calendar displays demonstration data hard-coded into the page, with no call at all to the workspace's data.
  • No manufacturing order is represented.
  • No entry, creation or moving of an event is possible.
  • The calendar is displayed twice.
  • A development area containing the word hello is still visible.
  • Only the day view exists: no weekly view and no monthly view.

See also​