Bills of materials
Purpose
A bill of materials describes what an article is made of: the list of components needed to produce a given quantity of it, with, for each one, the quantity consumed and the scrap rate expected.
It is the starting point of all production: without a bill of materials, the application does not know which components to reserve or which requirements to raise when you launch a manufacturing order.
Nomenclature ──► Gamme opératoire ──► Lancement / OF ──► Besoins
(of what?) (how?) (how many?) (what is missing?)
The module is visible to accounts holding the Production management right.
Access
- Menu: Production management → Bills of materials
- Address:
/nomenclatures - Screen title: Nomenclatures
The bill of materials list
The top bar contains ☰ side menu, 🏠 home, the Filtrer… field, the name of the signed-in account, the language selector and the account menu.
| Column | Content |
|---|---|
| Code | The bill of materials code. |
| Désignation | Its name. |
| Principale | Oui or Non — is this the article's reference bill of materials? |
| Article | The reference of the article produced. |
| Désignation article | Its designation. |
| Type | Fabrication, Commerciale composé, Commerciale composant or Article lié. |
| Action | ✏️ Editer. |
The list shows 50 bills of materials per page, with the pagination controls.
An article may have several — a variant composition, a trial version, an economy range. The Principale column names the one that counts as the reference: that is the one picked by default at launch time.
Creating a bill of materials
Click the ➕ button at the top left of the table: the Ajouter nomenclature window opens.
The header
| Field | Required | Description |
|---|---|---|
| Code | ✔ | The bill of materials code, unique in the workspace. |
| Désignation | ✔ | Its name. |
| Type de lancement | — | Par produit or Par matière première — see below. |
| Référence d'article | ✔ | The article produced. |
| Désignation de l'article | ✔ | Filled in automatically from the article record. |
| Principal | — | Tick box: this bill of materials is the reference one. |
| Type | — | The nature of the bill of materials. |
| Quantité à produire | — | The reference quantity the components relate to. |
| Quantité économique | — | The most cost-effective launch quantity. |
| Dépôt des encours | — | The warehouse where work in progress is stored. |
| Consommation encours | — | Tick box: work in progress is consumed by manufacturing. |
Enter the Référence d'article then leave the field: the application looks the article up and fills in its designation. If the reference is unknown, the message "Article non trouvé" appears in red — correct it before going on.
Component quantities are understood for that quantity produced. A bill of materials drawn up for 100 units and another for 1 unit do not read the same way: set this value first, before entering the components.
The launch types
| Launch type | Meaning |
|---|---|
| Par produit | You launch a quantity of finished product to obtain; the component requirements follow from it. |
| Par matière première | You start from a quantity of material available; the production obtained follows from it. |
The bill of materials types
| Type | Use |
|---|---|
| Fabrication | A genuine production composition, transformed in the workshop. |
| Commerciale composé | A set sold as a whole, put together at the point of sale. |
| Commerciale composant | An article sold separately but coming from a set. |
| Article lié | An article attached to another, with no transformation. |
The components
The Articles section, at the bottom of the window, lists the components. Click Ajouter to open the line form:
| Field | Description |
|---|---|
| Référence | The component reference. The designation fills in automatically. |
| Désignation | The component name. |
| Quantité | The quantity consumed, for the quantity to produce given in the header. |
| Taux de rebut (%) | The share of loss expected on this component, from 0 to 100. |
Confirm the line with Ajouter, or give up with Annuler. Each row of the table can then be edited or deleted through its icons.
It expresses the share of material lost in processing — offcuts, breakage, machine set-up. A rate of 5% on a component means you have to allow for 5% more than the theoretical quantity. Leave 0 if the loss is negligible.
Editing a bill of materials
On the row concerned, click the green ✏️ Editer icon: the Modifier nomenclature window opens with the header and the components already loaded.
Editing a bill of materials does not change the manufacturing orders already launched: those keep the composition in force when they were launched. The change will only apply to subsequent launches.
Messages and troubleshooting
| Situation | Message | What to do |
|---|---|---|
| The code already exists | Code dupliqué, added to the window title | Choose another code. |
| Unknown article reference | Article non trouvé, in red below the field | Check the reference, or create the article in Articles. |
| The save button stays greyed out | — | The code, the designation or the article reference is empty. |
| A component's Ajouter button stays greyed out | — | Reference, designation, quantity or scrap rate missing or out of range. |
| The scrap rate is refused | — | It must be between 0 and 100. |
| The work-in-progress warehouse you want does not appear | — | Create it from Sites, Dépots du centre button. |
| No bill of materials comes up at launch time | — | Check that a Principale bill of materials exists for the article. |
| The session has expired | Automatic return to the sign-in screen | Sign in again; the entry in progress is lost. |
Known limitations in this version
- No deletion is offered from the list: the Action column only contains the edit button, even though the function exists on the application side.
- No success message confirms the save: the window simply closes.
- Nothing prevents several bills of materials being marked as principal for the same article.
- The composition is not multi-level on screen: a component that is itself manufactured points to its own bill of materials, with no tree-style overview.
- No cost calculation is displayed from the components.
- The sort arrows in the headers are decorative.
See also
- Operation routings — the manufacturing steps.
- Production launches / MOs — launching into production.
- Sales management → Articles — the records of the articles and components.
- Sales management → Requirements — the shortfalls raised by manufacturing orders.
- Sites — the work-in-progress warehouses.